We wrote this from real daily requests coming from Alaqiq residents — real questions, practical answers.
What makes up the cost
Electronic detection (acoustic and thermal) locates most leaks without random demolition.
A hidden leak can run for months behind walls before showing on paint or your water bill.
مرتفعات جبلية ومدرجات زراعية To سهول تهامة الساحلية الحارة الرطبة — تنوّع مناخي Large From قمة الجبل To ساحل البحر الأحمر within hours.
Why quotes differ in Alaqiq
The cost splits into: assessment, materials, labor, warranty and after-service.
The cheapest quote is not the cheapest outcome if the work is redone within months.
Seasonal rains in Alaqiq make roof and upper-tank waterproofing essential, not optional.
Line items every quote should show
A sudden water-bill spike with unchanged usage is a classic hidden-leak signal.
A professional quote itemizes every line — a single vague total hides more than it shows.
When a low price is a red flag
Electronic detection (acoustic and thermal) locates most leaks without random demolition.
A hidden leak can run for months behind walls before showing on paint or your water bill.
A point many people miss
Electronic detection (acoustic and thermal) locates most leaks without random demolition.
A hidden leak can run for months behind walls before showing on paint or your water bill.
Indicative price ranges
These ranges come from the platform price list for this service group. They are indicative estimates only — the final quote follows the on-site assessment.
| Item | Unit | From (SAR) | To (SAR) |
|---|---|---|---|
| Tank waterproofing From الداخل after Statement | م² | 25 | 60 |
| Tank waterproofing From الداخل after Statement | م² | 25 | 70 |
| Tank waterproofing From الداخل after Statement | م² | 25 | 65 |
| Tank waterproofing From الداخل after Statement | م² | 25 | 60 |
| Tank waterproofing From الداخل after Statement | م² | 25 | 60 |
| Tank waterproofing From الداخل after Statement | م² | 25 | 60 |
| Tank waterproofing From الداخل after Statement | م² | 25 | 65 |
| Tank waterproofing From الداخل after Statement | م² | 25 | 60 |
Related guides
- building & facility leak surveys in Alaqiq: Rules & Licensing
- building & facility leak surveys in Alaqiq: When to Call Now
- building & facility leak surveys in Alaqiq: Questions to Ask
- building & facility leak surveys in Alaqiq: Cost of Delay
- building & facility leak surveys in Alaqiq: Sample Report
This guide is educational and does not replace a technical visit — every building has its own conditions.
Schedule your visit
