Pre-handover inspection for apartments in Jeddah

Prepared by the technical team · editorial review · last updated 13 November 2026 · Sources

In short: Pre-handover inspection for apartments in Jeddah starts with the asset survey and first inspection, then the periodic instrument leak checks, before anything is opened. Jeddah is about 2 km from the sea coast (OpenStreetMap). Published price: Inspection visit, SAR 150 per visit; anything else is quoted after the inspection.

Why pre-handover inspection differs in Jeddah

Jeddah is about 2 km from the sea coast (OpenStreetMap). The centre of Jeddah sits about 15 m above sea level (SRTM open elevation data).

Team note on Jeddah: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins..

Picture a family who has just bought an apartment in Jeddah from a developer and is days away from taking the keys. They have seen the flat once, liked the view, and assumed the finish was sound. Yet the handover is the last realistic chance to catch defects while the seller is still responsible for fixing them, and once the keys change hands, every fault becomes their own cost to solve.

The local setting shapes what to look for. The centre of Jeddah sits about 15 m above sea level, and the city lies about 2 km from the sea coast. That combination means the air carries salt and humidity from the Red Sea, which can work its way into metalwork, window frames, and concrete over time. Owners should pay close attention to balcony railings, door hinges, and fixings for early signs of corrosion or poor sealing. Costs for later fixes also matter: a maintenance visit typically falls in the SAR 160–420 range per visit, while restoration of surfaces runs SAR 55–160 per m², so small defects found at handover are far cheaper to settle than large ones discovered after a year of heat and sea air.

Work through the inspection in a clear order. First, walk the whole unit with the developer's representative and check walls, ceilings, and floors for cracks, uneven tiles, and damp patches, particularly near windows and balconies. Second, test every window, door, and lock, and look closely at the sealant around frames for gaps. Third, run every tap, flush every toilet, and check drainage and water pressure in each bathroom and kitchen, noting any leaks. Fourth, switch on all lights, sockets, and the air conditioning units to confirm they work. Fifth, record every defect in writing, with photos, and get the developer to sign a snag list that sets a deadline for repairs. Finally, do not accept the keys until the agreed fixes are complete or a firm timetable is in writing.

Service-area map for building maintenance & annual contracts in JeddahJeddah2 kmNSchematic · coordinates from Kashf data
Approximate area of Jeddah — a schematic that does not show any customer address.

In apartment buildings, the floor below is often where a leak shows first.

Signs that call for pre-handover inspection

If you notice one of these signs in Jeddah, it is a good moment to talk to the team:

Where the problem usually comes from

Tools and methods, and when we use them

Tool or methodWhat it measuresWhy it is chosen here
Periodic reports with a verification codeWhat was done, what is proposed and the spare partsLimits: depends on recording every visit
Periodic instrument leak checksSilent losses in the networksLimits: periodic, per contract
Asset survey and first inspectionThe condition of networks, insulation, roofs and ACLimits: the basis of the plan, not a substitute for it

From the first visit to the report

  1. Network checks: Water and drainage are tested.
  2. Insulation and roofs: Roofs, wet areas and tanks are inspected.
  3. Report: Findings in writing before you sign.

Facts and costs — Jeddah

ItemValueSource
District profileThe centre of Jeddah sits about 15 m above sea level (SRTM open elevation data)SRTM (NASA) open data
District profileJeddah is about 2 km from the sea coast (OpenStreetMap)© OpenStreetMap contributors (ODbL)
District profileTeam note on Jeddah: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins.Kashf team
Inspection visitSAR 150 per visitOwner price list (Jeddah)

Questions from Jeddah

Can I use household chemicals instead of calling a technician?

Using unsuitable chemicals may corrode pipes and does not fix the root cause of the blockage, so it is better to rely on a specialist technician.

What is the difference between foam insulation and other types of insulation?

Foam insulation is easy to apply on uneven surfaces and forms one continuous layer with no joints, while other types, such as bitumen rolls, need the joints to be welded. The contractor decides which is most suitable after inspecting the site.

Can thermal insulation be applied to an existing building?

Yes, thermal insulation can be installed on the roofs and walls of existing buildings without the need for major structural modifications. The contractor prepares the surface, then applies the insulating material and the protective layer over it.

Where does pre-handover inspection for apartments start in Jeddah?

We start with network checks (water and drainage are tested), then insulation and roofs (roofs, wet areas and tanks are inspected).

What does pre-handover inspection cost in Jeddah?

From our published price list: Inspection visit SAR 150 per visit. Quantities are confirmed at the inspection.

What do I receive after the work?

A findings report before handover, in a technical report that carries a verification code.

What we advise against

What you get after the work

The written output: a findings report before handover. The report is numbered and can be checked with its verification code.

Practical notes for residents of Jeddah

  • If you rent, tell your landlord or building management before the visit and agree in writing who pays; the written report can be shared with them.
  • Keep photos of the problem and of any earlier repairs — they help the technician compare before and after.
  • Prices are in Saudi riyals (SAR); the final price is confirmed after the inspection, before any work starts.
  • Have access ready to the water meter, the tank hatches, the roof and the main valve; in apartment buildings the roof keys are often with the building guard (haris).