Pre-construction treatment in Makkah: for companies (annual contract)
In short: In Makkah (Makkah), pre-construction treatment (for companies (annual contract)) begins with the inspection and diagnosis and the soil treatment and wall injection; nothing is opened until the position is clear. The centre of Makkah sits about 301 m above sea level (SRTM open elevation data). Published price: Termite treatment, SAR 10–25 per m²; anything else is quoted after the inspection.
Why pre-construction treatment differs in Makkah
The centre of Makkah sits about 301 m above sea level (SRTM open elevation data). Team note on Makkah: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins..
For companies in Makkah, the most common pest problem on commercial premises is rodent activity, which tends to surface first in storerooms, kitchens and service areas where food and packaging are kept. Left unchecked, it can quickly become a hygiene and reputational issue, so many business owners prefer a planned annual contract rather than reacting to sightings. Rodent control is typically priced at SAR 210–525 per visit, while an annual pest-control contract runs at SAR 525–1,575 per month, so the right arrangement depends on the size and risk profile of the site.
The local setting shapes the approach. The centre of Makkah sits about 301 m above sea level (SRTM open elevation data), a fact that matters because the treatment plan is built around the specific layout of the building and its surroundings rather than a generic template. Pigeons and other birds are a frequent concern on rooftops, ledges and courtyards, and bird control is usually quoted at SAR 30–85 per m, depending on the length of the area to be protected. Termite treatment is priced at SAR 10–25 per m², so any timber, furniture or structural elements that are already affected should be assessed before the wider contract is set up.
Before the visit, ask the provider to confirm exactly what is included in each price, such as the number of pest-control visits, whether a follow-up visit is part of the contract, and what a follow-up visit costs at SAR 105–265 per visit. Ask how the site will be inspected, what records will be kept for your facility, and how urgent call-outs are handled outside the scheduled programme. Clarify which areas are covered, including storage, kitchens, loading zones and roof spaces, and request a written scope before any work begins. A clear scope makes it easier to compare quotes and to keep your premises protected all year.
For companies, an annual contract sets the scope, the visit schedule and the reports in writing.
Signs that call for pre-construction treatment
These are the signs most often linked to pre-construction treatment:
- New land before the slab is poured
- Taking over a new unit
The most common causes
- Site moisture — we check this before anything else.
- A common cause: untreated soil.
Tools we use in Makkah
| Method | What it helps with | Its role in Makkah |
|---|---|---|
| Inspection and diagnosis | The pest, its hiding places and entry points | Limits: needs access to the kitchen, cupboards and entries |
| Soil treatment and wall injection | Termites around the foundation | Limits: a long-term plan |
How the work is done, step by step
- Site inspection: Soil and moisture conditions.
- Treatment: Applied at the right construction stage.
- Documentation: A record for the property file.
Makkah in facts and sources
| Item | Value | Source |
|---|---|---|
| District profile | Team note on Makkah: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins. | Kashf team |
| District profile | The centre of Makkah sits about 301 m above sea level (SRTM open elevation data) | SRTM (NASA) open data |
| Termite treatment | SAR 10–25 per m² | Owner price list (Makkah) |
Questions from Makkah
What does finishing work typically include?
It covers plastering, painting, flooring, stone or marble walls, ceilings, gypsum, doors, windows, and final electrical and plumbing installations. You can request full or partial finishing, with the scope clearly defined in the price quote.
Is it possible to renovate the building without evacuating the residents?
In many cases it can be carried out in phases without a full evacuation if the damage is limited. However, for extensive structural renovation, a temporary evacuation may be recommended to ensure safety, and the contractor will explain this in their proposal.
Does waterproofing require removing existing tiles?
It depends on the site condition. Sometimes surface waterproofing can be applied over tiles, while deep leaks require tile removal to treat the layer underneath. A technician will determine the best option after inspection.
What is the first step of pre-construction treatment (for companies (annual contract))?
We start with site inspection (soil and moisture conditions), then treatment (applied at the right construction stage).
How much does pre-construction treatment cost in Makkah?
From our published price list: Termite treatment SAR 10–25 per m². Quantities are confirmed at the inspection.
What do I get at the end?
A treatment report for the property file, in a technical report that carries a verification code.
What we advise against
- Postponing treatment until after construction
The written outputs
You receive: a treatment report for the property file, in a technical report with a verification code.
Practical notes for residents of Makkah
- Have access ready to the water meter, the tank hatches, the roof and the main valve; in apartment buildings the roof keys are often with the building guard (haris).
- Prices are in Saudi riyals (SAR); the final price is confirmed after the inspection, before any work starts.
- Keep photos of the problem and of any earlier repairs — they help the technician compare before and after.
- If you rent, tell your landlord or building management before the visit and agree in writing who pays; the written report can be shared with them.
Sources and method
- SRTM (NASA) open data
- Kashf team
- Customer questions (reviewed)
- Owner price list for Makkah
- Local pages are published only after a quality gate: real local facts, text similarity of no more than 15% with any other English page, and a claims check.
- النسخة العربية
