Home About Us Services Guide Emergency Service Our Services Documented Report Tools Hub Glossary Blog Service Cities FAQ Pest Control Contact Us
Book onlineTracking number at once · no holdCall nowWater leak emergencyWhatsAppMessage us

Pre-construction treatment in Makkah: when to call a technician

Prepared by the technical team · editorial review · last updated 13 November 2026 · Sources

In short: Pre-construction treatment (when to call a technician) in Makkah starts with the inspection and diagnosis, then the soil treatment and wall injection, before anything is opened. The centre of Makkah sits about 301 m above sea level (SRTM open elevation data). Pricing starts from Termite treatment (SAR 10–25 per m²), and other items are quoted after the visit.

What is specific about Makkah for pre-construction treatment

The centre of Makkah sits about 301 m above sea level (SRTM open elevation data). Team note on Makkah: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins..

Picture an owner preparing a building in Makkah for new construction, with an old structure being cleared and the site left open for several weeks. Before any new foundations go in, the land and existing buildings often carry pests that will move into the works if nobody deals with them first. The owner wants the job done before the builders arrive, so that the site is clean when work starts and nothing has to be redone later.

The local facts matter here. The centre of Makkah sits about 301 m above sea level, according to SRTM open elevation data, so the city is not a low coastal plain but still a place where open ground and disturbed soil can draw in insects and rodents. Pre-construction treatment is therefore a step to plan early rather than something to add at the end. Costs also depend on the work involved. Bird control is priced at SAR 30–85 per m, termite treatment at SAR 10–25 per m², and rodent control at SAR 210–525 per visit. A single pest-control visit runs SAR 160–420, and a follow-up visit is SAR 105–265 per visit, so an owner should expect a second visit once the first treatment is done.

Practical steps help keep the process orderly. First, walk the site and the existing building with the technician before demolition, noting signs of termites, rodents and nesting birds. Second, book the main treatment before excavation starts, so that soil and structural timber are treated while still accessible. Third, schedule the follow-up visit once the initial treatment has settled, and do not begin foundations until that check is complete. Fourth, if the site is large or the work will run for some time, ask about a monthly pest-control contract, which runs SAR 525–1,575 per month, so that the site stays protected while construction continues. Calling a technician at the planning stage, rather than after problems appear, is the simplest way to protect the build.

Service-area map for pest control & prevention in MakkahMakkah2 kmNSchematic · coordinates from Kashf data
The approximate extent of Makkah — the exact location of your job is set when you book.

Some signs can be watched for a few days; others need a technician straight away — the signs list above helps you decide.

Signs worth paying attention to

The following signs are worth checking before they grow:

Causes we see in the field

Tools we use in Makkah

MethodWhat it helps withIts role in Makkah
Inspection and diagnosisThe pest, its hiding places and entry pointsLimits: needs access to the kitchen, cupboards and entries
Soil treatment and wall injectionTermites around the foundationLimits: a long-term plan

How the work is done, step by step

  1. Site inspection: Soil and moisture conditions.
  2. Treatment: Applied at the right construction stage.
  3. Documentation: A record for the property file.

Quick comparison: facts and costs in Makkah

ItemValueSource
District profileTeam note on Makkah: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins.Kashf team
District profileThe centre of Makkah sits about 301 m above sea level (SRTM open elevation data)SRTM (NASA) open data
Termite treatmentSAR 10–25 per m²Owner price list (Makkah)

Short answers for Makkah

What does finishing work typically include?

It covers plastering, painting, flooring, stone or marble walls, ceilings, gypsum, doors, windows, and final electrical and plumbing installations. You can request full or partial finishing, with the scope clearly defined in the price quote.

Is it possible to renovate the building without evacuating the residents?

In many cases it can be carried out in phases without a full evacuation if the damage is limited. However, for extensive structural renovation, a temporary evacuation may be recommended to ensure safety, and the contractor will explain this in their proposal.

Does waterproofing require removing existing tiles?

It depends on the site condition. Sometimes surface waterproofing can be applied over tiles, while deep leaks require tile removal to treat the layer underneath. A technician will determine the best option after inspection.

Where does pre-construction treatment (when to call a technician) start in Makkah?

We start with site inspection (soil and moisture conditions), then treatment (applied at the right construction stage).

What does pre-construction treatment cost in Makkah?

From our published price list: Termite treatment SAR 10–25 per m². Quantities are confirmed at the inspection.

What do I receive after the work?

A treatment report for the property file, in a technical report that carries a verification code.

What we advise against

The written outputs

You receive: a treatment report for the property file, in a technical report with a verification code.

If you live in Makkah and are new to the area

  • You can message us on WhatsApp in English; the booking details are sent back to you in the chat to confirm before the visit.
  • The Saudi weekend is Friday and Saturday; mention your preferred day and time when booking.
  • Have access ready to the water meter, the tank hatches, the roof and the main valve; in apartment buildings the roof keys are often with the building guard (haris).
  • Prices are in Saudi riyals (SAR); the final price is confirmed after the inspection, before any work starts.

Sources and method

  • SRTM (NASA) open data
  • Kashf team
  • Customer questions (reviewed)
  • Owner price list for Makkah
  • Local pages are published only after a quality gate: real local facts, text similarity of no more than 15% with any other English page, and a claims check.
  • النسخة العربية