Pre-construction treatment for restaurants in Makkah
In short: In Makkah (Makkah), pre-construction treatment for restaurants begins with the inspection and diagnosis and the soil treatment and wall injection; nothing is opened until the position is clear. The centre of Makkah sits about 301 m above sea level (SRTM open elevation data). Published price: Termite treatment, SAR 10–25 per m²; anything else is quoted after the inspection.
Why pre-construction treatment differs in Makkah
The centre of Makkah sits about 301 m above sea level (SRTM open elevation data). Team note on Makkah: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins..
Will a new restaurant in Makkah really need pest treatment before it opens? For most owners the answer is yes, and it is far easier to deal with pests before the kitchen is fitted out than after. Makkah sits about 301 m above sea level, and that matters less for pests than it does for the planning around them: a building that is set up correctly from the start is much simpler to keep clear. Pre-construction treatment is the stage where a contractor works on the structure itself, before equipment, stock and staff arrive.
The visit usually begins with a walk through the site to find where pests could enter or settle. The inspector checks for signs of rodents, looks at the areas where birds may nest or perch, and assesses whether termites are a risk in the timber or soil around the building. Bird control is priced at SAR 30–85 per m, and termite treatment at SAR 10–25 per m². Rodent control is charged at SAR 210–525 per visit, and a standard pest-control visit at SAR 160–420 per visit. Once the inspector has measured the areas involved, the work is planned around those figures and the layout of the building.
Before the visit, it helps to have the site ready for inspection. Clear access to the kitchen shell, storerooms, roof edges, drains and any service ducts so the inspector can reach them without delay. Bring the floor plan and any drawings that show where pipes, cables and openings run through the walls. If the site has been empty for some time, note any droppings, damage or stored materials you have seen. Ask the contractor about follow-up work as well: a follow-up visit costs SAR 105–265 per visit, and an annual pest-control contract runs at SAR 525–1,575 per month, so it is worth agreeing on the schedule before the restaurant opens.
For restaurants, visits are planned outside service hours and recorded for the premises file.
When do you need pre-construction treatment?
If you notice one of these signs in Makkah, it is a good moment to talk to the team:
- New land before the slab is poured
- Taking over a new unit
Where the problem usually comes from
- Site moisture.
- A common cause: untreated soil.
Tools and methods, and when we use them
| Tool or method | What it measures | Why it is chosen here |
|---|---|---|
| Inspection and diagnosis | The pest, its hiding places and entry points | Limits: needs access to the kitchen, cupboards and entries |
| Soil treatment and wall injection | Termites around the foundation | Limits: a long-term plan |
The steps in order
- Site inspection: Soil and moisture conditions.
- Treatment: Applied at the right construction stage.
- Documentation: A record for the property file.
Facts and costs — Makkah
| Item | Value | Source |
|---|---|---|
| District profile | Team note on Makkah: Kashf teams serve this city and its nearby districts with the same documented inspection standard: device-based leak detection without demolition, a written report, and a clear scope before any work begins. | Kashf team |
| District profile | The centre of Makkah sits about 301 m above sea level (SRTM open elevation data) | SRTM (NASA) open data |
| Termite treatment | SAR 10–25 per m² | Owner price list (Makkah) |
Questions from Makkah
What does finishing work typically include?
It covers plastering, painting, flooring, stone or marble walls, ceilings, gypsum, doors, windows, and final electrical and plumbing installations. You can request full or partial finishing, with the scope clearly defined in the price quote.
Is it possible to renovate the building without evacuating the residents?
In many cases it can be carried out in phases without a full evacuation if the damage is limited. However, for extensive structural renovation, a temporary evacuation may be recommended to ensure safety, and the contractor will explain this in their proposal.
Does waterproofing require removing existing tiles?
It depends on the site condition. Sometimes surface waterproofing can be applied over tiles, while deep leaks require tile removal to treat the layer underneath. A technician will determine the best option after inspection.
What is the first step of pre-construction treatment for restaurants?
We start with site inspection (soil and moisture conditions), then treatment (applied at the right construction stage).
How much does pre-construction treatment cost in Makkah?
From our published price list: Termite treatment SAR 10–25 per m². Quantities are confirmed at the inspection.
What do I get at the end?
A treatment report for the property file, in a technical report that carries a verification code.
Common mistakes we see
- Postponing treatment until after construction
What you receive
You receive: a treatment report for the property file, in a technical report with a verification code.
Planning the visit in Makkah
- Have access ready to the water meter, the tank hatches, the roof and the main valve; in apartment buildings the roof keys are often with the building guard (haris).
- Prices are in Saudi riyals (SAR); the final price is confirmed after the inspection, before any work starts.
- Keep photos of the problem and of any earlier repairs — they help the technician compare before and after.
- If you rent, tell your landlord or building management before the visit and agree in writing who pays; the written report can be shared with them.
Sources and method
- SRTM (NASA) open data
- Kashf team
- Customer questions (reviewed)
- Owner price list for Makkah
- Local pages are published only after a quality gate: real local facts, text similarity of no more than 15% with any other English page, and a claims check.
- النسخة العربية