Insulation quality record — documentation step by step
اقرأ Here is what this page is for بالعربية
Waterproofing is covered by tiles or backfill and is unseen a day after execution. The quality record keeps what happened before covering: which material, which batch, what thickness, whether the flood test passed, and what everything looked like in photos. It is linked to the warranty certificate and verifiable on the verification page by its number and code.
What it contains
- A checklist specific to the insulation type (roof, tank, bathroom, foam, basement).
- Materials and batch numbers.
- Measurements: thickness at points, density, upstand height on walls.
- Flood or fill test result with its date.
- Before/during/after photos (public only with your consent).
- The linked warranty certificate number.
Why
So the warranty rests on documented execution rather than memory, and so you or the next buyer can know what was actually done. Its correct description: an “internal execution quality record” from the establishment, not a certificate from an external body.
Honest limits
- An internal record from the establishment; not a third-party inspection.
- Photos are published on the verification page only with the customer’s consent.
- It documents what was executed at execution time and does not monitor the insulation afterwards.
Frequently asked questions
Do I get a copy?
Yes, a PDF with the warranty certificate and a verification link.
On-site service is available in Saudi Arabia only. The online tools can be used anywhere.
We explain what the feature does and does not do. Estimated values (probabilities, indicators, estimates) support a decision and are not a final diagnosis; confirmation comes from an on-site inspection.
